Image Collection
NE-CAT Photo Gallery
2/16/2009 New MD2 installed on 24-ID-C beamline with...
1/23/2009 NE-CAT Resource Advisory Committee Meets....
11/04/2008 NE-CAT’s second MD2 microdiffractometer is...
From left to right, Jon Schuermann who joined NE-CAT in...
6/23/08 User End Station on ID-C complete with Robot.
5/06/08 NE-CAT organizes a successful workshop titled...
1/22/2008 Modified ALS sample placement robotic system...
11/16/2007 Resource Advisory Committee Members (left to...
Resource Advisory Committee Meeting Held November 16,...
10/01/2007 24-ID-E equipped with a MD-2...
9/04/2007 The move of the 8-BM Bending Magnet Beam Line...
06/08/07 16x16x300 micron crystal irradiated at 5...
04/13/2007 MD2 Micro-Diffractometer - Aligning Crystal
04/13/2007 MD2 Micro-Diffractometer – Anxiously Awaiting...
04/13/2007 MD2 Micro-Diffractometer – Successful First...
04/13/2007 MD2 Micro-Diffractometer - 1st Diffraction Image
03/21/2007 MD2 Microdiffractometer Installed on 24-ID-E...
02/16/2007 First Data Taken on Phase 2, 24-ID-E Beam Line
12/15/2006 MD2 Diffractometer being bench tested (shown...
12/06/2006 Phase 2 User Control Area Instrumented (rose...
05/22/2006 Phase 2 Horizontal Focusing Mirror and Photon...
05/22/2006 Phase 2 Vertical Focusing Mirror in Place
4/27/2006 Installation of 24-ID Fixed Energy Beam Line...
02/17/2006 Model of MD2 Diffractometer Showing Internal...
02/01/2006 ALS Designed sample placement robotics system...
02/17/2006 Purchase award made to ACCEL for acquisition...
1/18/2006 Phase 1 Control Console
1/17/2006 Phase 2 Monochromator
01/09/2006 24-BM Enclosure Construction - Most Panels...
12/28/2005 Internals of Phase 2 Monochromator
11/07/2005 ALS Auto-Mount Robotic System being installed...
10/10/2005 Phase 2 Monochromator Crystal Translation Stage
10/10/2005 Phase 2 Monochromator vacuum Tank
09/23/2005 Sample Placement Robotic System Being Assembled
2/14/2005 Rotary Shutter - 1mm Slotted Rotor.
2/14/05 Fast Rotary Shutter Installed (green Arrow).
2/07/2005 24-ID Vertical (top trace) and Horizontal...
1/28/2005 Phase 2 Side Bounce Monochromator - Crystal...
01/28/2005 Phase 2 Side-Bounce Monochromator Design.
11/17/2004 First Test Crystal Data Set Obtained From...
11/16/2004 Crystal Mounted in X-ray Beam
11/16/2004 Looking Down Beamline to Detector.
11/16/2004 Crystal Mounted in X-ray Beam.
11/04/2004 Installation of 24-ID User Areas Completed
10/31/2004 24-ID Beamline Optics Installation Completed.
9/20/2004 Endstation Installation Looking Upstream
9/20/2004 Endstation Installation Looking Downstream
9/14/2004 Endstation Slits, Shutters, and BPM Installed
08/05/2004 Malcolm Capel and Ian Campton (OD) Observe...
08/04/2004 Installation of Phase 1 Focusing Mirrors
07/01/2004 Focusing Mirror Being Placed into 24-ID-C
6/23/2004 Burn spot due to monoenergetic beam in the...
6/23/2004 Malcolm observing the monochromatic beam from...
6/23/2004 Monochromator fully installed in the 24-ID-B...
5/28/2004 First Crystal Assembly
05/13/2004 Phase 1 monochromator being installed
04/07/2004 NE-CAT Receives "Key" For The Enclosures.
03/29/2004 24-ID-E Interior.
03/29/2004 24-ID-D Interior
03/29/2004 24-ID-C Interior
03/29/2004 24-ID- From Above Looking Downstream.
03/29/2004 24-ID-B & C Top View
03/26/2004 First Light into 24-ID-B
03/11/2004 24-ID-A Fixed Masks Installed.
2/11/2004 Ed Lynch and Malcolm Capel Begin Assembly of...
1/28/2004 ADSC Quantum 315 Detector undergoing...
1/20/2004 Construction of 24-ID-E (foreground), B, D,...
1/20/2004 Construction of 24-ID-E (foreground), B, and D...
1/20/2004 Construction of 24-ID-B and C
1/9/2004 24-ID Kohzu Double-Crystal Monochromator...
12/18/2003 24-ID Oxford-Danfysik Mirror Assembly Being...
12/15/2003 Construction of 24-ID-B and C
12/03/2003 First Light from Dual Canted Undulator. Dual...
11/21/2003 Construction of 24-ID-B and C
10/27/2003 Construction of 24-ID_A (background) and B...
9/15/2003 Installation of Sector 24_ID Dual Canted...
9/15/2003 Installation of Sector 24-ID Front End
9/15/2003 Sector24 APS Experimental Floor - Beginning of...
05/03/2002 MOU Signing Ceremony. Dr.J. Murray Gibson,...
05/03/2002 Dr Steven Ealick, Director of NE-CAT, Signing...
05/03/2002 Dr. Steven Ealick, Director of NE-CAT,...
05/01/2002 Home of NE-CAT. APS Laboratory Office Module...
Location of CAT Sectors Around APS Synchrotron Storage Ring
Aerial View of APS Facility
2/16/2009 New MD2 installed on 24-ID-C beamline with...
Total images:
85
| Last update:
2/17/09 2:55 PM
| ©
JAlbum
&
Chameleon
|
Help